Prefabricated house factory with Lidamodularhouse: Installation Efficiency – Flat-packed container house: The quick installation process ensures shorter construction times. A team of four workers can complete the installation of a single modular house in just 3 hours. Alternatively, the houses can be transported in full containers and connected to water and electricity on-site for immediate use. Light steel movable plank building: The installation process is time-consuming, taking 20-30 days, including pouring concrete foundations, constructing the main body, installing color steel plates, suspending the ceiling, and installing water and electricity. This method poses a high risk of operation and labor loss. See additional details on modular houses China.
Lida Flat Pack Container House can be used as labor camp house , refugee camp house, staff camp house, mining camp house, temporary accommodation buildings, toilet and shower building, laundry room, kitchen and dining/mess/canteen hall, recreation hall, mosque/prayer hall, site office building, clinic building, guard house. Lida Container house is widely used as the labor camp or army in general contracting projects, Oil and gas field projects, Hydroelectric Projects, Military projects, mining sectors projects, and so on, which are intended for short- and long-term site mobilization. Welcome to visit Lida container house manufacturer.
Lida Integrated Camps are widely used in General Contracting projects, Oil and gas field projects, Hydroelectric Projects, Military projects, mining sectors projects, and so on, which are intended for short- and long-term site mobilization. Lida Construction Site Labor Camp are designed to deliver the most appropriate and economical solution in terms of prefabricated house buildings, container house building or both of production system in line, which need to take the time, cost, site location, client requirements, and government regulations into consideration.
Lida Construction Site Labor Camp building is made of light steel as structure and sandwich panels for wall and roof. Insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass, which is determined by the demand and environment requirements. Lida Construction Site Labor Camp buildings can be assembled several times after one site construction finished, installed easily and cost effective.
The Lida Group Integrated Camp Prayer Room is an important part of the integrated camp and is used to pray for blessings. The prayer room can be part of a dormitory office building or a separate building. The building area is tailored to the number of camps to meet the needs of camp personnel. The litigation room of the Lida Group’s comprehensive camp uses a lightweight steel structure skeleton and uses composite panels for maintenance. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. After the completion of a project, the camp building can be demolished and reinstalled at another site, which is easy to install and recycles to reduce costs. Discover additional details at lidamodularhouse.com.
Lida can provide large-scale farms and supporting facilities for customers. The chicken house is generally 6-15 meters wide and 30-100 meters long. The height of the flat coop is generally 2.2-2.4m, and the height of the high bed coop is about 5m. There are open type, windowed type and closed type in the chicken house, depending on the climate conditions. The exhibition hall is generally built with steel structure and glass curtain wall, simple and beautiful. This kind of structure is widely used in automobile exhibition hall and 4S shop.
Lida Group is one of the most modular house manufacturers in China. That we has become member of several associations such as China Steel Structure Association, China Council for the Promotion of International Trade and China Building Metal Structure Association etc. In 2017, Lida Group was awarded the Demonstration Base of Assembly Building in Shandong Province. In the reconstruction of Sichuan after 5.12 Earthquake, Lida Group was praised as an advanced enterprise because of its outstanding contribution.